Get Started

Apply Now

CPD Training

We run free "Lunch & Learns" (CPD training sessions) from Dorking, Oxted and Reigate council offices. Aimed at local agents, architects, engineers and contractors, they cover the latest techniques and innovations within the building industry, as well as changes to the building regulations. CPD certificates are issued following each session by the presenter.

Informal and friendly, Lunch & Learns start at 12.30pm and last about an hour. A buffet lunch follows when attendees can network and chat to the presenter and our own team of surveyors. Details of our current programme are given below:

If you would like to join us at our next Lunch & Learn session or be added to our regular CPD email invitation list, please contact Sue Daly at sue.daly@southernbcp.co.uk.

3
Jul

Plumis Ltd

Hydra fire suppression misting system

03/07/2019 12:30

Oxted

Hydra fire suppression misting system

Plumis is one of the UK's leading water-mist manufacturers having previously developed the Automist and Smartscan systems and will be joining us to present on the latest in their product range of fire suppresion water-mist systems the Hydra.  This has been developed based on customer feedback and post Grenfell, to provide a safe and trusted alternative solution to sprinklers for fire safety in larger residential buildings.

 


12
Sep

Keystone Group

Smartroof - Offsite construction for room in roof houses

12/09/2019 12:30

Oxted

Smartroof

Smartroof is a fully insulated pre-fabricated off site solution for room in roof house types.  Smartroof offers a safer, faster alternative to traditional methods of construction such as attic or top hat trusses.

Smartroof takes over at wall plate level and provides a fully structured roof. Various systems are available to suit a client's needs and meet U-value requirements.


25
Sep

Rockwool/Rockpanel

Post Hackitt Update - Fire safety of buildings over 18m

25/09/2019 12:30

Reigate

Post Hackitt Update

Following their very informative and interesting presentation last October Keith and Gerald are returning to give an update on changes since the outcomes of the Hackitt Report.


8
Oct

Tyvek

Fabric First

08/10/2019 12:30

Dorking

Fabric First

Join us for this informative CPD presentation on Tyvek roof and wall systems. Topics covered include; meeting the requirements of Approved Docs C2 and L, the detrimental effects of ventilation, principles of the Tyvek non-ventilated pitched roof system, testing, installation, advantages, acceptance/approval, modern membrane comparison and Tyvek wall applcations.


RSS

123